Building Renovation Progress

 

Front ramp going in                          Back ramp too !

frontramp2.jpg (1291469 bytes)                                    backramp3.jpg (1248915 bytes)

 

Most frequently asked                         

question:  white cable is                      New closet for

TEMPORARY  phone.                       acolyte vestments

cable1.jpg (1376108 bytes)                                   acolytecloset1.jpg (1269083 bytes)

 

 

 

New windows really help

   windows2.jpg (1272682 bytes)

 

 

Heating & AC ducts installed            Back ramp taking shape

      HVAC.jpg (1115289 bytes)                    backramp2.jpg (1234456 bytes)

 

 

New front door                             New roof going on   

frontdoor1.jpg (1230060 bytes)                       newroof.jpg (1125610 bytes)

 

   New space for youth dowstairs       Expanded children's  chapel

   picture downstairs 1.gif (3552108 bytes)                   childrenchapel1.jpg (1396853 bytes)

 

 

Power lines underground            PowerLines.jpg (1285018 bytes)

 

 

          Look at all that space!      Picture inside 1.gif (3584412 bytes)

 

 

                                      Walls going up !!        Picture Walls.gif (3662493 bytes)

 

 

Back ramp being planned            Picture back ramp 1.gif (1322547 bytes)  (photographer was excited)